Get in Touch

Icon

Daycare in Pune in 2026 sits under two rules at once. The Code on Social Security, 2020 requires every establishment with 50 or more employees to provide a childcare facility within a prescribed distance, and Section 23 of the Maharashtra Shops and Establishments Act, 2017 separately requires a suitable room for the children of workers wherever fifty or more workers are employed. Maharashtra adds something the central rule does not: a group of establishments may run one common facility within a radius of one kilometre, with the Chief Facilitator’s permission. For parents, the practical benchmark is the national guideline of one caregiver for every 10 children under 3 and every 20 children aged 3 to 6. Elly Child Care runs centres on company premises.

TL;DR

  • Two rules apply: The central Code and Maharashtra’s own Shops and Establishments Act both set a 50-employee threshold.

  • Pune’s own provision: Employers within one kilometre of each other can pool into a single shared facility, subject to approval.

  • Where the demand is: The Hinjawadi IT park alone reports more than 300,000 employees across 150-plus industries.

  • The commute problem: Pune Metro Line 3, the 23.2 km Hinjawadi to Shivajinagar corridor, was at 94.58 per cent physical progress as of end-January 2026 and has slipped past several targets.

  • What to expect inside: Ratios of 1:10 and 1:20, 10 to 12 sq ft per child, 8 to 10 operating hours and shift cover where the site runs shifts.

What Maharashtra Law Requires That Central Law Does Not

Most national guidance treats workplace childcare as one obligation. In Pune, an employer is working with two.

The Press Information Bureau’s backgrounder on the Code on Social Security states that every establishment with 50 or more employees must provide a childcare facility within a prescribed distance, that the duty is gender-neutral, and that a mother must be allowed four visits a day. It also permits a common facility run by a government body, a private entity or a group of employers pooling resources.

Section 23 of the Maharashtra Shops and Establishments Act, 2017 then adds a state-level requirement: in every establishment employing fifty or more workers, a suitable room or rooms must be provided and maintained for the children of those workers. Its proviso is the part Pune employers should read twice. Where a group of establishments decides to provide a common facility within a radius of one kilometre, the Chief Facilitator may permit it, subject to conditions in the order.

That one-kilometre clause changes the options inside a business park, where several employers sit within walking distance of each other. Our compliance guide for HR and admin teams covers the central position in full, and a Pune employer should read it alongside the state Act rather than instead of it.

Where Pune’s Demand Sits, and Why the Commute Decides It

Pune’s childcare demand is concentrated where its employers are. The Hinjawadi Industries Association reports that the Rajiv Gandhi Infotech Park houses more than 300,000 employees across over 150 industries, spread across three phases in the west of the city. Kharadi in the east is the second major cluster, and the Chakan and Pimpri-Chinchwad manufacturing belt runs on shift patterns rather than office hours.

Distance is the deciding variable. The national guidelines place a centre within 500 metres of the workplace or of the families’ neighbourhood, and Maharashtra allows pooling only within one kilometre. Pune’s road commute makes that geography unusually strict in practice. The Pune Metropolitan Region Development Authority describes Metro Line 3, the 23.2 km elevated corridor from Hinjawadi to Shivajinagar with 23 stations, as a project undertaken specifically to address traffic problems in and around the IT park. The authority’s own page reports physical progress at 94.58 per cent as of the end of January 2026.

Until that corridor carries passengers along its full length, a parent in Hinjawadi who places a child near home in Wakad or Baner is accepting a long gap between themselves and the child during the working day. That is the argument for a centre at the workplace rather than near the house.

What Working Parents in Pune Should Expect From a Centre

Parents comparing centres in Pune can hold each one against a published national standard. The Ministry of Women and Child Development’s National Minimum Guidelines of 2 November 2018 set out what a workplace centre should provide:

  • Ratios: One caregiver for every 10 children under age 3, and one for every 20 children aged 3 to 6, each group with a helper.

  • Space: A minimum of 10 to 12 sq ft per child, with the centre within 500 metres of the workplace or the family’s neighbourhood.

  • Hours: Preferably 8 to 10 hours a day, flexible to parents’ working hours, and run in shifts where the establishment itself runs day and night shifts.

  • Staff checks: A background check on all workers before appointment, and mandatory police verification of the guard.

  • Health: A medical check-up by a qualified practitioner, a doctor on call and a stocked first aid kit.

  • Food: Meals sent by parents. At Elly Child Care centres, children bring their meals from home.

Elly Child Care accepts children from 6 months to 6 years, runs a curriculum powered by Little Elly, and sends parents daily updates through its dedicated app and WhatsApp.

Two Decisions Facing a Pune Employer

Two decisions shape the cost and the timeline.

On-site or tie-up. A dedicated centre inside the office or plant is Elly Child Care’s primary model, with the employer providing the space and Elly Child Care running it with its own staff. Pricing covers operating the centre for a minimum of 10 children and is pro-rated as enrolment grows, and the two models are compared in our on-site and tie-up pricing guide.

Hours must match the site, not the brand. Elly Child Care aligns operating hours and holiday schedules to each company’s own calendar. For a Chakan or Pimpri-Chinchwad plant, that means asking directly how shift timings are covered before anything is signed. For a multi-tenant campus, the shared model is set out in our guide for IT companies and tech parks, and the same models running in another city are described in our Bengaluru guide.

Where the Pune Picture Is Still Moving

Two things are worth stating plainly rather than glossing over.

The metro timeline has moved repeatedly. A November 2025 report quoted officials targeting a March 2026 launch for full operations, and that date passed. Any childcare plan built on the assumption that a parent will soon cross the city quickly is a plan resting on a schedule that has already slipped.

There is also no public scoreboard. A Pune employer cannot benchmark itself against a published register, and a parent cannot look one up. Both have to ask the provider directly and visit the centre.

To discuss an on-site or shared centre in Pune, start with Elly Child Care’s corporate programme.

Frequently asked questions

Is daycare mandatory for companies in Pune?
Yes, on two counts. The Code on Social Security, 2020 requires a childcare facility at every establishment with 50 or more employees, and Section 23 of the Maharashtra Shops and Establishments Act, 2017 requires a suitable room for workers’ children wherever fifty or more workers are employed in the state.
Can two companies in Pune share one daycare centre?
Yes. Section 23 of the Maharashtra Shops and Establishments Act, 2017 allows a group of establishments to provide a common facility within a radius of one kilometre, with permission from the Chief Facilitator and subject to conditions. The central Code separately permits employers to pool resources for a common facility.
What staff-to-child ratio should a Pune daycare follow?
The Ministry of Women and Child Development’s 2018 National Minimum Guidelines recommend one caregiver for every 10 children under age 3, and one for every 20 children aged 3 to 6, each group with a helper. Ask any Pune centre to confirm its ratio by age group in writing.
How close to the office does a workplace daycare have to be?
The Code on Social Security requires a facility within a “prescribed distance” set by rules. The 2018 National Minimum Guidelines recommend within 500 metres of the workplace or of the family’s neighbourhood, and Maharashtra’s shared-facility route applies within a one-kilometre radius.
Does Elly Child Care operate in Pune?
Elly Child Care sets up and runs centres on company premises, and its tie-up model uses Little Elly centres.
What ages does a workplace daycare cover?
Workplace childcare in India covers children from 6 months to 6 years, the age band used in both the 2018 National Minimum Guidelines and the government’s Palna scheme. Elly Child Care accepts children in the same 6 months to 6 years range.

[1][2][3][4][5][6]

Sources

  1. indiankanoon.org ↩
  2. pib.gov.in ↩
  3. aiu.ac.in ↩
  4. pmrda.gov.in ↩
  5. hiapune.in ↩
  6. pib.gov.in ↩